CABLING
ROYAL MAIL
Appointed by Levertech Engineering Services, AH Connections were tasked with splicing and testing the fibre optics cables installed by the principal contractor at the new Royal Mail depot located in Warrington.
WORKING WITH
Royal Mail, End User
Beumer Group, Contractor
Lever Tech, Contractor
OBJECTIVES
Survey site and supply costs
Set up & splice 18 x 12 core multi mode fibre cables
Testing to industry standards utilising a Fluke DSX500
CHALLENGES
Proficiency in meeting tight deadlines
Availability to respond to site requests within 24 hours
Ensuring uninterrupted operations for the client during the entire process
‘Working with AH Connections was straightforward, we had a tight timescales with our client and they managed to survey and attend site within 48 hours. They were able to complete works in a timely manner and work to the end users timescales and standards’
- Allen Rutherford, Levertech Engineering Services Ltd
PROJECT OUTCOME
The project was successfully completed within the specified customer time frames, meeting all deadlines without any additional expenses beyond the initial quote. Comprehensive testing was conducted on-site prior to handover, and the test results were promptly provided to the customer.
READY TO CABLE WITH CONFIDENCE?
Don't let poor infrastructure slow down your business. Our team at AH Connections specialise in providing fast, secure, and reliable network solutions. Contact us today to discuss your infrastructure needs.